Articles

       

Supervision of the Works Guideline

According to FIDIC a Contractor shall give or provide all necessary supevision during the execution of the Works.

Supervisor  

Programme for the Works Guideline

The establishment and continual monitoring of a detailed, critical path method programme is essential for the...

Bar Chart
In addition to the constant management and supervision of the Works, all significant types of works must also be under the close control of competent trade supervisors...| more   management of the Project.This will include a detailed Critical Path Method programme establishing key milestones and completion dates for the various sections of the Contractl...| more
line   line

Clause 14 Programme Guideline

The Contractor is bound by the FIDIC Contract to submit the Clause 14 programme within 28 calendar days after...

Critical Path  

Monthly Progress Reports

FIDIC requires that the Contractor submit monthly updates of the Programme demonstrating progress to date.

Progress report
This programme must cover all aspects of the design, approval, procurement, construction, installation, removal and commissioning of the temporary and permanent works...| more   The Contractor is generally required to attend monthly Progress Meetings with the Engineer to report the progress of the design, procurement and construction works...| more
line   line

Extension of Time Claims

Claims and Delays are commonly associated with construction and its related activities.

Delays  
Method Statements Guideline

Method Statements describes how the Works are to be designed, procured and constructed

Method Statement
Most contractors are not legal experts and find themselves all too often in a situation where a delay has occurred whereby they did not have the necessary paperwork or records in place to make such a recovery ...| more   In addition to the above all hazardous work activities should be described by the issue of Detail Method Statement. As a general guideline each Method Statement should be structured and prepared in the following format...| more
line   line
 Page 3 of 5  1  2  3  4  5 »
  TEMPLATES MENU
Commercial Cost Control
Project Management
Contractual
Tendering / Estimating
Health & Safety
Human Resources
Quality Control
Safety Training
PDF Templates
Procedure Manuals
FULL HOUSE Special
Smartphone Apps
Client List
 
 
 
Online Construction Document Templates developed by Contractors for Contractors
Site Lock Valid HTML 4.01 Transitional Privacy Eco Certified Construction Document Templates
Copyright © Online-TemplateStore 2009-2021
spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer